Tomago BESS Connection
Project duration
2024-2026
Enerven has been appointed to design and construct two new 132kV switchbays, along with approximately 900m of 132kV underground cable and fibre, connecting the existing Transgrid 132kV Tomago Substation to the AGL Tomago BESS substation, facilitating the reliable transmission of electricity.