Snuggery HV Transmission Line and Substations

Snuggery HV Transmission Line and Substations 

 

Client:ElectraNet

Location: South East South Australia

Duration: April 2007 - December 2007

Contract Type: Engineer, Procure, Construct (EPC)

Value: Capital value of total project $20m

Snuggery

This new transmission line scope included:

  • 42km of 132kV line and the installation of 252 stobie poles of heights between 21m and 26m.
  • 16 brace poles and 8 main strain sections of which the first and the eighth strain sections were designed to accommodate future circuits.
  • Design, supply, installation and commissioning of the new protection and control systems, radio and fibre links between substations.